Routing Area Update Procedure

Routing Area Update Procedure
RAU procedure will happen in the following two case:
-MS entered a new Route Area
-Periodic RAU ( after periodic timer expires)
Inter-SGSN RAU
-The new SGSN find the old SGSN from the old RAI
-Old SGSN stop downlink signaling, transfer MM context and PDP context to new SGSN
-Tunnelling N-PDU to the new SGSN
-Update PDP context and subscriber data









Share this article :
 
Copyright © 2011. Telecommunication and IT Today - All Rights Reserved
Proudly powered by http://telecomedu.blogspot.com