Network Architecture

Network Architecture

Route area update procedure
-SGSN can manage the MS location information via RAU procedure in RAI level
Relocation procedure
-Move the Iu interface to the other RNC
Handover procedure
-Move the radio link to the other NodeB

Share this article :
 
Copyright © 2011. Telecommunication and IT Today - All Rights Reserved
Proudly powered by http://telecomedu.blogspot.com